At Long Last Extension Has Started

PHL Logo

Our Pule Hill Lodge Logo

As 90% of our client base already know we need to develop our facility due to rapid increase in demand.

Work has now commenced on the long awaited extension.  The builders will have arrived, trowels in hand, to convert an existing stable to the new isolation units.  The units are to the same high specification of our existing lodgers but are to be used for the purpose of isolating any guests who need to be removed from the main block.

The timescale for the isolation unit development is approximately 7 to 10 days.  New drains are to be laid, Floors and walls tiled and sleeping areas are to be insulated.

Ground works have already started on the new extension with the area excavated.  Site levels determined and post-holes dug.